Моля изберете Вашият сайт по подразбиране

Затвори  

Metal industry

Previous Next

Снимка 1/2

Кратка история:

A modern production and warehouse hall for company Tekra Sp. z o.o was built within 4,5 months. It produces elements and semi-finished elements used in the metal industry.

A modern production and warehouse hall for company Tekra Sp. z o.o was built in Gubin (Poland) within 4,5 months. It produces elements and semi-finished elements used in the metal industry.
 
The factory with an area of 2,360m² is located in Gubin in the Kostrzyńsko-Słubicka Special Economic Zone. The investment includes a single-storey hall of production and storage, as well as a social-office located in the two-storey building.
 
The glass case in the social-office part is made in aluminum and glass, which gives the building a modern character. Wall panels are made of Lindab LPA/LPG system, while the roof in the hall is made of DSR system with insulation of mineral wool. In the hall three cranes will operate with a capacity of 10 tons each and 4 smaller ones of a capacity of 2 tons each. On a plot of 2,78 ha there is maneuvering area for trucks (1,800m²), parking for 37 cars, and maneuvering roads.
 
map

Tekra sp. z o.o.

ul. Przemysłowa 1

66-620 Gubin

Poland

Контакт