Varbergs Sjukhus

Previous Next

Bilder 1/4


The Project: Air duct system and comfort products for hospital modernization and extension

Verwendete Produkte:

​The modernization of Varberg hospital encompass both the renovation of some 3.000 m2 of existing buildings as well as a completely new 4.650 m2 surgery building. This ongoing project is not only a very demanding one from a logistical point of view, since all hospital facilities are up and running during the 4 year building process.

As all hospital installations, it is also a demanding one from a technical point of view. The ventilation installation performed by Oscar Hanson VVS includes an extensive duct system from Lindab as well as some 150 Professor and Polaris chilled and heating beams.

By using the brand new Lindab Leakage Tester LT510 Oscar Hanson continuously tests and verifies the system’s tightness requirements with unrivalled simplicity.