Aluminium production

Previous Next

Image 1/2

Story in short:

The design and preparation of the project required Lindab buildings engineers to work with the Belarus Authorities in order to obtain Belarus Technical Approval. Many adaptations of Lindab buildings design concept were made to conform to specific local norms and construction practices. The 17,000m² project, equipped with cranes, subsequently was completed after 8 months erection time

Used products:

Alutech Incorporated manufactures aluminum products and components.
 
The design and preparation of the project required Lindab buildings engineers to work with the Belarus Authorities in order to obtain Belarus Technical Approval. Many adaptations of Lindab buildings design concept were made to conform to specific local norms and construction practices. The 17,000m² project, equipped with cranes, subsequently was completed after 8 months erection time.    
 
 
 