Prisma Bauelemente GmbH from Leinefelde (Germany) built the main office of the company ERKO Präzisions- und Steuerungstechnik GmbH.
A 6,800m², three-module production building and a 500m² wing unit for deliveries was constructed. The roof includes numerous continuous skylights and bares large solar panels.

Prodhimet e përdorura:

Prisma Bauelemente GmbH from Leinefelde (Germany) built the main office of the company ERKO Präzisions-und Steuerungstechnik GmbH, who specializes in the field of CNC – Computerized Numerical Control machines.
 
On this occasion a single storey building with a pumice concrete facade was erected. Soon, however, more space was needed and a second one was built to the left of the initial structure, followed by a building to the right. The land became strained and the present project on the green meadow was initiated.
 
A 6,800m², three-module production building and a 500m² wing unit for deliveries was constructed. The roof includes numerous continuous skylights and bares large solar panels. The masterpiece of the ensemble, however, is a three-storey building that is 25m long, 18m wide and 10m high. This turnkey building has a negative roof slope of 6% with central valley gutter, a parapet on all sides and a roof extension. The building is provided with LPR1000-roof panels and a high quality sandwich wall panel in the colour of white aluminium, architecturally stressed with gentian blue.     
 
 
 
 